Applications
Concrete & building materials
Ready-mixed concrete
Precast concrete
Special & high-performance concrete
Hydro dam concrete
Sand-lime blocks
Kalksandstein
Dry building materials
Sand & gravel
Road construction
Mining & minerals
Disposal
Mixers
Mixers
Twin-shaft continuous mixer (LFK)
Planetary mixer (BPX)
Dry powder batch mixer (DMX)
Twin-shaft batch mixer (DKX)
Single-shaft continuous mixer (MFKG)
Combimix process (DKXC)
Ring layer mixer (AVA HRM)
Horizontal mixer (AVA HTC/HTK)
Laboratory mixer
Plant concepts
Used machines
Crushers
Tests & consulting
After-Sales
Sales
Showroom
Solutions
Processes for metal recovery
Light metal scrap
Automotive shredder residue (ASR)
Waste electrical & electronic equipment (WEEE)
Batteries
Incinerator bottom ash (IBA)
Ferrous & nonferrous slags
Metal recovery from fine fractions
Processes for industrial waste
Machines
Impact crushing
Rotorshredder (RS)
Rotor impact mill (RPMV & RPMX)
Impact crusher (PB) & Impact mill (PM)
Rotor centrifugal crusher (RSMX)
Cutting & tearing shredding
Biomass crushers
Plant control systems
Classifying & sorting
Used machinery
Tests & consulting
After Sales
Sales
Showroom
The Sino-Pakistani consortium CEC- POWERCHINA and Pakistan Frontier Works Office is building the Diamer-Basha Dam in northern Pakistan, near the Chinese border. The construction project is not only of central importance for Pakistan in terms of energy policy, but also stands for closer Sino-Pakistani cooperation. For the world's largest dam with a planned height of 272 meters, 18.6 million cubic meters (including 17.1 million RCC and 1.5 million normal concrete) will be built over the next few years.
BHS-Sonthofen in Tianjin (China) is supplying a total of six twin-shaft batch mixers for this this year. The scope of delivery includes four mixers of type DKX 7.0 with 7 m3 each and two mixers of type DKX 6.0 with 6 m3 concrete discharge per batch. Of the machines manufactured in Tianjin, two each will be delivered in September, October and November. In the coming year, BHS is expected to deliver another six mixers. According to current planning, the construction of the dam will end in 2029.