Applications
Concrete & building materials
Ready-mixed concrete
Precast concrete
Special & high-performance concrete
Hydro dam concrete
Sand-lime blocks
Kalksandstein
Dry building materials
Sand & gravel
Road construction
Mining & minerals
Disposal
Mixers
Mixers
Twin-shaft continuous mixer (LFK)
Planetary mixer (BPX)
Dry powder batch mixer (DMX)
Twin-shaft batch mixer (DKX)
Single-shaft continuous mixer (MFKG)
Combimix process (DKXC)
Ring layer mixer (AVA HRM)
Horizontal mixer (AVA HTC/HTK)
Laboratory mixer
Plant concepts
Used machines
Crushers
Tests & consulting
After-Sales
Sales
Showroom
Solutions
Processes for metal recovery
Light metal scrap
Automotive shredder residue (ASR)
Waste electrical & electronic equipment (WEEE)
Batteries
Incinerator bottom ash (IBA)
Ferrous & nonferrous slags
Metal recovery from fine fractions
Processes for industrial waste
Machines
Impact crushing
Rotorshredder (RS)
Rotor impact mill (RPMV & RPMX)
Impact crusher (PB) & Impact mill (PM)
Rotor centrifugal crusher (RSMX)
Cutting & tearing shredding
Biomass crushers
Plant control systems
Classifying & sorting
Used machinery
Tests & consulting
After Sales
Sales
Showroom
The Association for Waste Management Kempten (ZAK) is a consortium made up of waste management bodies in the city of Kempten and the districts of Lindau and Oberallgäu in southern Germany. The waste of 312,000 residents is collected, recycled and disposed of in ZAK’s waste management plants. About 25,000 tons of green waste and organic waste are processed in the fermentation plant each year. This is used to produce natural gas, with a biogas yield of three million standard cubic meters in total per year. In order to achieve this, Komptech GmbH based in Frohnleiten, Austria, constructed a new biomass treatment plant.